{"id":42787,"date":"2021-01-18T17:06:13","date_gmt":"2021-01-18T16:06:13","guid":{"rendered":"https:\/\/efectis.com\/?p=42787"},"modified":"2024-07-31T15:01:24","modified_gmt":"2024-07-31T13:01:24","slug":"fse-studies-for-gebze-darica-and-fahrettin-altay-narlidere-kaymakamlik-metro-projects","status":"publish","type":"post","link":"https:\/\/efectis.com\/en\/fse-studies-for-gebze-darica-and-fahrettin-altay-narlidere-kaymakamlik-metro-projects\/","title":{"rendered":"FSE studies for Gebze &#8211; Dar\u0131ca and Fahrettin Altay-Narl\u0131dere Kaymakamlik Metro Projects"},"content":{"rendered":"\n<p><strong>Tunnel ventilation system capacity and operation scenarios have been defined within the scope of the projects of Gebze Dar\u0131ca Metro (11 stations, 15.4 km in length) and Fahrettin Altay-Narl\u0131dere Kaymakamlik Metro (7 stations, 7 km in length). National and international standards, regulations and technical specifications were used.<\/strong><\/p>\n\n\n\n<p>In the studies, possible vehicle fire scenarios for tunnels and switch zones are simulated using Subway Environment Simulation (SES \u2013 tunnel ventilation). As a result, fan capacities were calculated and boundary conditions were determined for use in Computational Fluid Dynamics (CFD) analysis for station emergency cases.<\/p>\n\n\n\n<p>Following SES analysis, 3D models of the stations were prepared and transferred to CFD modules to check the efficiency of emergency ventilation systems and of smokeproof and fireproof means of egress. The realistic outside air boundary conditions and the fans operating in accordance with the fire scenario in the event of an emergency were evaluated in conjunction with one another, and the tunnel boundary conditions were defined.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-thumbnail\"><img loading=\"lazy\" decoding=\"async\" width=\"250\" height=\"150\" data-id=\"42806\" src=\"https:\/\/efectis.com\/app\/uploads\/2021\/01\/22-250x150.png\" alt=\"\" class=\"wp-image-42806\"><\/figure>\n\n\n\n<figure class=\"wp-block-image size-thumbnail\"><img loading=\"lazy\" decoding=\"async\" width=\"250\" height=\"150\" data-id=\"42800\" src=\"https:\/\/efectis.com\/app\/uploads\/2021\/01\/21-250x150.png\" alt=\"\" class=\"wp-image-42800\" srcset=\"https:\/\/efectis.com\/app\/uploads\/2021\/01\/21-250x150.png 250w, https:\/\/efectis.com\/app\/uploads\/2021\/01\/21-180x109.png 180w\" sizes=\"auto, (max-width: 250px) 100vw, 250px\" \/><\/figure>\n<\/figure>\n\n\n\n<p>Determining fluid behaviour is crucial in engineering calculations. SES analysis \u2013 which is also defined as 1D analysis \u2013 was conducted assuming that parameters such as air, speed and temperature do not change in the horizontal (y direction) and vertical direction (z direction) of the tunnels, because the width and height of the tunnel are much shorter than the tunnel length. On the other hand, 3D analysis provides significant advantages in terms of time and cost in determining data such as heat transfer, pressure loss and flow rates in complex models.<\/p>\n\n\n\n<p>Contact: Ulker Verenel &#8211; <a href=\"mailto:ulker.verenel@efectis.com\" class=\"rank-math-link\">ulker.verenel@efectis.com<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tunnel ventilation system capacity and operation scenarios have been defined within the scope of the projects of Gebze Dar\u0131ca Metro (11 stations, 15.4 km in length) and Fahrettin&#8230;<\/p>\n","protected":false},"author":10,"featured_media":42794,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","_uag_custom_page_level_css":"","footnotes":""},"categories":[90],"tags":[],"class_list":["post-42787","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"uagb_featured_image_src":{"full":["https:\/\/efectis.com\/app\/uploads\/2021\/01\/2.png",1200,550,false],"thumbnail":["https:\/\/efectis.com\/app\/uploads\/2021\/01\/2-250x150.png",250,150,true],"medium":["https:\/\/efectis.com\/app\/uploads\/2021\/01\/2-300x138.png",300,138,true],"medium_large":["https:\/\/efectis.com\/app\/uploads\/2021\/01\/2.png",1200,550,false],"large":["https:\/\/efectis.com\/app\/uploads\/2021\/01\/2-1024x469.png",1024,469,true],"1536x1536":["https:\/\/efectis.com\/app\/uploads\/2021\/01\/2.png",1200,550,false],"2048x2048":["https:\/\/efectis.com\/app\/uploads\/2021\/01\/2.png",1200,550,false],"gform-image-choice-sm":["https:\/\/efectis.com\/app\/uploads\/2021\/01\/2.png",300,138,false],"gform-image-choice-md":["https:\/\/efectis.com\/app\/uploads\/2021\/01\/2.png",400,183,false],"gform-image-choice-lg":["https:\/\/efectis.com\/app\/uploads\/2021\/01\/2.png",600,275,false]},"uagb_author_info":{"display_name":"Monique","author_link":"https:\/\/efectis.com\/en\/author\/monique\/"},"uagb_comment_info":0,"uagb_excerpt":"Tunnel ventilation system capacity and operation scenarios have been defined within the scope of the projects of Gebze Dar\u0131ca Metro (11 stations, 15.4 km in length) and Fahrettin...","_links":{"self":[{"href":"https:\/\/efectis.com\/en\/wp-json\/wp\/v2\/posts\/42787","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/efectis.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/efectis.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/efectis.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/efectis.com\/en\/wp-json\/wp\/v2\/comments?post=42787"}],"version-history":[{"count":0,"href":"https:\/\/efectis.com\/en\/wp-json\/wp\/v2\/posts\/42787\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/efectis.com\/en\/wp-json\/wp\/v2\/media\/42794"}],"wp:attachment":[{"href":"https:\/\/efectis.com\/en\/wp-json\/wp\/v2\/media?parent=42787"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/efectis.com\/en\/wp-json\/wp\/v2\/categories?post=42787"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/efectis.com\/en\/wp-json\/wp\/v2\/tags?post=42787"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}