The use of facilities other than the laboratories of Notified Bodies for testing electrical cables covered by EN 50575: Power, control and communication cables – Cables for general applications in construction works subject to reaction to fire requirements, is governed by Article 44 (Article 46) of the Construction Products Regulation (EU) No. 305/2011.

APPLICATION

Use of facilities other than those of the Notified Body for testing:

1) At the request of the manufacturer and where justified by technical, economic or logistical reasons, Notified Bodies may decide to carry out the tests specified in Annex V of the CPR, or have them carried out under their supervision in the manufacturer’s facilities or in the facilities of a Notified Body, for the assessment and verification of constancy of performance under AVCP Systems 1+ and 3.

2) Before conducting these tests, Efectis verifies whether the requirements of the test method are fulfilled and assesses the following aspects:

ACCREDITATION AND COMPETENCE OF EFECTIS PERSONNEL

The Efectis personnel responsible for carrying out or supervising the tests under Article 44 (Article 46) of Construction Products Regulation (EU) No. 305/2011 are duly authorized for the relevant test methods.

MANUFACTURER’S REQUEST AND VERIFICATION CONDITIONS

The manufacturer shall clearly and explicitly justify its request in writing. The application of Article 44 (Article 46) shall be analyzed and documented in a report setting out the justified reasons for accepting or rejecting the request.

CONTROL OF THE QUALITY OF RESULTS

Comparison of test results based on historical data (tests carried out on the same cable by the Efectis laboratory and tests performed by the laboratory where testing under Article 44 (Article 46) is to be conducted) shall be completed before verification of the suitability of the equipment.

If comparison of test results/data indicates different classifications, the worst-case performance shall prevail and, where necessary, additional testing shall be carried out. In such cases, the applicability of Article 44 (Article 46) shall be reassessed.

VERIFICATION OF THE SUITABILITY OF RESOURCES AND METHODS

Accreditation to EN ISO/IEC 17025 for the relevant test methods may be considered evidence of competence but does not in itself demonstrate compliance with all requirements applicable to Notified Bodies under Article 42 of the Construction Products Regulation.

Preliminary documentation review

Metrological traceability

On-site assessment

VERIFICATION REPORT FOR THE APPLICATION OF ARTICLE 44 (ARTICLE 46)

A verification report concerning the application of Article 44 (Article 46) and the conditions under which it has been implemented shall be prepared by Efectis.

As Efectis, we are pleased to have obtained the designation as a Notified Body under System 1+ in accordance with Article 44 (Article 46) of the Construction Products Regulation (CPR).

This important designation further strengthens our ability to provide reliable, independent and internationally recognized conformity assessment and certification services in compliance with European Union legislation for the relevant product groups.

Through Efectis’ technical expertise and impartial approach, we remain committed to creating value for industry stakeholders and contributing to quality assurance in the field of construction products.